Del Monte Beach Stormdrain
Description
The City proposes to perform the following: 1) install 3 manholes along Tide Ave.; 2) Remove a sewer manhole in the dune area; 3) Install a new pipe at corner of Surf Way and Tide Ave.; 4) Clean out an existing sewer pipe along Tide Ave. and reuse for a storm drain; 5) Remove and replace one outfall at the terminus of Beach Way and Tide Ave. The outfall will include a new headwall; 6) Remove exposed section of pipe at two existing outfalls. Cap and leave the remaining portion of buried pipe; 7) Conduct related restoration of the affected environment.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Monterey Approving Del Monte Beach Outfall Consolidation Project and Associated
City of Monterey Del Monte Beach Stormdrain