SCH Number 2005031008
Project Info
- Title
- Pump Station Forcemain Replacement Project
- Description
- The operator proposes to construct a new forcemain pipeline underneath the San Elijo Lagoon, replacing a 40 year old pipeline buried at a separate location under the lagoon. The forcemain pipeline will be installed 45 or more feet below the surface of the lagoon, using both conventional trenching methods and Horizontal Directional Boring (HDD). Disruption of the lagoon involves the manual surveying placement (on foot) of several individual survey beacon trackers and/or two guide wires across the lagoon surface to electronically guide the pipeline during the HDD effort. The survey beacon trackers and/or guide wires will be removed upon completion of the project. (SAA# 1600-2006-0175-R5)
2 documents in project