SCH Number 2004122121
Project Info
- Title
- Petaluma River / Trail Enhancement Project
- Description
- The project is limited to the construction of a clear span pedestrian bridge across the Petaluma River. Concrete abutments founded on concrete drilled piers/precast concrete piles will be constructed above the high tide line on each side of the Petaluma River to provide structural support for an approximately 10-foot-widem, 140-foot-long prefabricated clear span pedestrian bridge. The bridge will be installed approximately 2.5 feet higher than the 100-year flood elevation.
3 documents in project