SCH Number 2004111059


Project Info

Title
Prop. 13 Water System Improvement
Description
The project consists of improvements to City of Livingston water distribution infrastructure. The existing water distribution system was reviewed in Fall 2003 by Carollo Engineers, and found to be in need of upgrading and replacement. Replacement pipes range in size from 6-12 inches, and will replace pipes found within existing rights of way around the City. Approximately 15,000 lineal feet of pipes will be replaced in the following locations: 1st and 2nd Streets; 4th and 6th Streets; Frontage Road; 8th Street; Stefani Avenue; Hammatt Road; F and G Streets; Ally South of F Street; and Davis Street.