SCH Number 2004091102


Project Info

Title
Injection of Gaseous Ozone for Remediation of Groundwater at 76 Station #6923
Description
Under the oversight of the Los Angeles Regional Water Quality Control Board, ConocoPhillips Company proposes to operate a C-Sparge™ system to remediate the dissolved-phase petroleum hydrocarbon plume beneath the site. The C-Sparge™ technology combines low-flow (3 to 5 cubic feet per minute [cfm]) air sparging with ozonation to oxidize petroleum hydrocarbons into benign byproducts, carbon dioxide and water. Ozone is generated onsite using a control panel with built-in compressor and ozone generator. Using perforated sparge points, microbubbles (10 to 50 µm) of encapsulated ozone are introduced below the water table, where the oxidation reactions take place.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Regional Water Quality Control Board, Region 4 (Los Angeles) Injection of Gaseous Ozone for Remediation of Groundwater at 76 Station #6923
Regional Water Quality Control Board, Region 4 (Los Angeles) Injection of Gaseous Ozone for Remediation of Groundwater at 76 Station #6923