SCH Number 2004091071
Project Info
- Title
- City of Big Bear Lake Department of Water and Power Lake Williams Interconnection Water Pipeline
- Description
- The proposed project is construction and installation of approximately 13,540 lineal feet of 6-inch interconnecting pipeline, which would deliver water from the existing Erwin Lake water system to the Lake Williams water system.
2 documents in project