SCH Number 2004052074


Project Info

Title
Mesa Park Ballfield Irrigation and Public Restroom Project
Description
The Resource Recovery Center is a green waste/composting facility. The well currently is used to water compost at the Resource Recovery Center during dry months and to support an on-site small scale farming operation. The project will use water from this well to irrigate existing ballfields at mesa Park. Mesa Park is located on BCPUD lands, APN #193-020-45, 47 & 59, on the north side of Mesa Road, directly across the street from APN #193-030-38. The well is electrically powered through a connection to the Pacific Gas & Energy system. The 3 horse power well pimp will distribute water through new 1-1/2"PVC piping to be installed as a part of the project along the existing, paved paths on APN#193-030-38 to a point of connection at the existing piping infrastructure, approximately 1,325 linear feet northeast of the well. This existing 1975 linear feet of piping infrastructure already is plumbed into water storage tanks at Mesa Park.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Bolinas Community Public Utility District (BCPUD) Mesa Park Ballfield Irrigation and Public Restroom Project
Bolinas Community Public Utility District (BCPUD) Mesa Park Ballfield Irrigation and Public Restroom Project
Bolinas Community Public Utility District (BCPUD) Waste Water Reclamation Project