- Title
- Northside Transmission Pipeline
- Description
- The proposed project involves the construction of 3,150 linear feet of 24-inch portable water transmission line that will connect the Truckee Donner Public Utility District's (District's) Bridge Street 6170 Tank site to the District's Northside Tank site at the western end of the alignment. The purpose of the project is to increase the east-west transmission capabilities within the District's water system.
3 documents in project