SCH Number 2004021028
Project Info
- Title
- CDP/PK 03-030 404-480 Washington Boulevard, Marina Del Rey, CA 90292 (Parcel 95/Parcel LLS)
- Description
- The proposed project is a request for a Coastal Development Permit to allow for the redevelopment of an existing shopping center (22,293 sq ft) located on Parcel 95 and a public parking lot on Parcel LLS, and the subsequent construction, operation, and maintenance of a commercial retail center consisting of four (4) buildings, surface and rooftop parking facilities with 234 vehicle spaces, and a public park with a small performance stage. Demolition of 16,680 sq ft of the existing shopping center will occur prior to new construction, with the exception of the 5,713 sq ft restaurant on the west side of the parcel which will be renovated but not demolished (Building D). There will be a total of four (4) commercial/retail buildings on site after construction totaling 39,266 sq. ft. (this total includes the existing 5,713 sq. ft. restaurant that will remain on site; but does not include the 450 sq. ft. of proposed outdoor dining area). After construction, there will be three new structures: Building "A" (two-stories, 19,803 sq. ft.) is designed for a bank, restaurant, and offices; Building "B" (14,200 sq. ft.) is designed for a restaurant and retail use; and Building "C" (a two level parking structure with rooftop parking partially over Building "B"). The proposed project represents a 16,873 sq. ft. increase over the current uses on site. On the east side of the site, Parcel LLS will be renovated from an existing 10-space public parking lot into a public park. Also requested is Parking Permit to allow the provision of 225 on-site parking spaces instead of the 261 required spaces (41% reduction). 80 of the 225 space provided on site would be tandem spaces (with a professional valet parking service to manage these spaces). It will take approximately 14 working days for demolition, clearance and grading of the existing site and it is estimated that ten truck trips per proceed south on Lincoln, and then proceed in the 90 (Marina) Freeway on ramp.
2 documents in project