SCH Number 2004011122


Project Info

Title
Injection of Gaseous Ozone for the Remediation of Groundwater at Former 76 Station #5195
Description
Under the oversight of the Regional Board, ConocoPhillips proposes to conduct a one-month feasibility test using C-Sparge to remediate the dissolved-phase petroleum hydrocarbon plume beneath the site. The C-Sparge technology combines low-flow [3 to 5 cubic feet per minute (cfm)] air sparging with ozonation to oxidize petroleum hydrocarbons into benign byproducts, carbon dioxide (CO2) and water (H2O). Ozone is generated onsite using a control panel with built-in compressor and ozone generator.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Regional Water Quality Control Board, Region 4 (Los Angeles) Injection of Gaseous Ozone for the Remediation of Groundwater at Former 76 Station #5195
Regional Water Quality Control Board, Region 4 (Los Angeles) Injection of Gaseous Ozone for the Remediation of Groundwater at Former 76 Station #5195