SCH Number 2003112099


Project Info

Title
Chapel of the Chimes Long Range Master Plan (SD-09-03)
Description
The Chapel is an existing cemetery located at 32992 Mission Blvd. (State Route 238), at the Union City and Hayward City limits border. The entire site is 56.05 acres, of which 10.8 acres are proposed for burial expansion on the Hillside Terrace. The applicant is proposing a Long Range Master Plan for the entire cemetery in four development phases. The applicant has stated that the proposed goals of this MP are to provide a wide rage of high qaulity burial options, and to make responsible and efficient use of the cemetery's limited remaining land resources. The current Site Development Review and Use Permit app. is a request for conceptual approval of the proposed Master Plan for the entire site and approval of the specific development plan or the Hillside Terrace site that would be implemented in the very near future.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Union City Chapel of the Chimes Long Range Master Plan (SD-09-03)
Union City Chapel of the Chimes Long Range Master Plan (SD-09-03)