SCH Number 2003091101
Project Info
- Title
- Construction of the Zone 2 Transmission Pipeline Project - Line No. 9804
- Description
- The Zone 2 Transmission Pipeline Project will serve as a dedicated transmission main from the existing Highland Pump Station to the existing Bastanchury Reservoir. The proposed construction of the water transmission pipeline would span approximately 8,700 sq. ft. from the Highland Booster Station to the Bastanchury Reservoirs and will allow groundwater to be moved directly from Zone 1 Highland Reservoir to the Zone 2 Bastanchury Reservoir. Includes valves and underground piping and related equipment.
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Yorba Linda Water District | Zone 2 Transmission Pipeline Project | |
NOD | Yorba Linda Water District | Construction of the Zone 2 Transmission Pipeline Project - Job No. 9804 | |
NEG | Yorba Linda Water District | Construction of the Zone 2 Transmission Pipeline Project - Line No. 9804 |