SCH Number 2003091101


Project Info

Title
Construction of the Zone 2 Transmission Pipeline Project - Line No. 9804
Description
The Zone 2 Transmission Pipeline Project will serve as a dedicated transmission main from the existing Highland Pump Station to the existing Bastanchury Reservoir. The proposed construction of the water transmission pipeline would span approximately 8,700 sq. ft. from the Highland Booster Station to the Bastanchury Reservoirs and will allow groundwater to be moved directly from Zone 1 Highland Reservoir to the Zone 2 Bastanchury Reservoir. Includes valves and underground piping and related equipment.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Yorba Linda Water District Zone 2 Transmission Pipeline Project
Yorba Linda Water District Construction of the Zone 2 Transmission Pipeline Project - Job No. 9804
Yorba Linda Water District Construction of the Zone 2 Transmission Pipeline Project - Line No. 9804