SCH Number 2003072162


Project Info

Title
Freeport Boulevard / 21st Street Two-Way Conversion Project EIR (SL01)
Description
The Reduced Capacity Two-Way Conversion Alternative (the approved project) includes the conversion of both Freeport Boulevard and 21st Street to two-way operation. Freeport Boulevard would have one northbound and one southbound travel lane between 4th Avenue and Broadway, and would be signed as a Class III bicycle route. Parking would be maintained except at signalized intersections. 21st Street would have one northbound and one southbound travel lane as well, and would be signed a striped with Class II bicycle lanes. Median island barriers would be constructed and placed at intersections on 21st Street, between Castro Way and 4th Avenue, to prevent vehicles from making left-turns to/from the residential streets serving the Curtis Park neighborhood. On-street parking woud also be maintained on 21 Street. Additionally, the Freeport Boulevard / 21st Street intersection would be signalized and reconfigured to provide a protected crossing for bicyclists and pedestrians.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
City of Sacramento Freeport Boulevard / 21st Street Two-Way Conversion Project EIR (SL01)
City of Sacramento Freeport Boulevard / 21st Street Two-Way Conversion Project EIR (SL01)
City of Sacramento Freeport Boulevard / 21st Street Two-Way Conversion Project EIR (SL01)