Southtown Project
Description
The Project is limited to excavating an approximately 85-foot long, 5-foot-wide, and up to 9.5-foot-deep trench to install a 15-inch diameter truck sewer main. Three abandoned pipes in the channel will be removed during project activities. The excavation location is presently armored with existing riprap. Following the completion of the sewer crossing, the riprap will be replaced in the same footprint and the Project area will be returned to pre-project conditions.
Download CSV New Search

 

10 documents in project

Type Lead/Public Agency Received Title
City of Vacaville Brazelton Drain Fill Phase 2 Project
City of Vacaville Brazelton Drain Fill Phase 2 Project
City of Vacaville Southtown Phase 1-A Tentative Map Extension
City of Vacaville Southtown Phase 1-A Tentative Map Extension
City of Vacaville Southtown Phase 1-A Tentative Map Extension
City of Vacaville Southtown Subdivision
City of Vacaville Southtown Project
City of Vacaville Southtown Project
City of Vacaville Southtown Project
City of Vacaville Southtown Project