SCH Number 2003062071
Project Info
- Title
- Southtown Project
- Description
- The Project is limited to excavating an approximately 85-foot long, 5-foot-wide, and up to 9.5-foot-deep trench to install a 15-inch diameter truck sewer main. Three abandoned pipes in the channel will be removed during project activities. The excavation location is presently armored with existing riprap. Following the completion of the sewer crossing, the riprap will be replaced in the same footprint and the Project area will be returned to pre-project conditions.
10 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | City of Vacaville | Brazelton Drain Fill Phase 2 Project | |
NOD | City of Vacaville | Brazelton Drain Fill Phase 2 Project | |
NOD | City of Vacaville | Southtown Phase 1-A Tentative Map Extension | |
NOD | City of Vacaville | Southtown Phase 1-A Tentative Map Extension | |
NOD | City of Vacaville | Southtown Phase 1-A Tentative Map Extension | |
NOD | City of Vacaville | Southtown Subdivision | |
NOD | City of Vacaville | Southtown Project | |
NOD | City of Vacaville | Southtown Project | |
EIR | City of Vacaville | Southtown Project | |
NOP | City of Vacaville | Southtown Project |