SCH Number 2003061153


Project Info

Title
Berth 97-109 [China Shipping] Container Terminal Project
Description
The Recirculated Draft SEIR is a complete recirculation of the Draft SEIR released on June 16, 2017. The significant new information int he Recirculated Draft SEIR centers around the evaluation of the operation of the terminal from 2008-2014 under the set of mitigation measures approved in a previously certified 2008 EIR, to the extent those were implemented, and its continued operation in the future under new and/or modified mitigation measures, along with an incrementally higher cargo throughout level compared to that assumed in the 2008 EIR. The analysis examines whether potentially new significant environmental impacts or substantially more severe impacts would occur in the areas of Air Quality, Greenhouse Gases, and Ground Transportation.
Download CSV New Search

 

8 documents in project

Type Lead/Public Agency Received Title
Port of Los Angeles BERTHS 97-109 (CHINA SHIPPING] CONTAINER TERMINAL PROJECT
Los Angeles Harbor Department BERTHS 97-109 [CHINA SHIPPING] CONTAINER TERMINAL PROJECT
Port of Los Angeles Berth 97-109 [China Shipping] Container Terminal Project
Port of Los Angeles Berth 97-109 [China Shipping] Container Terminal Project
Port of Los Angeles Berth 97-109 [China Shipping] Container Terminal Project
Port of Los Angeles Berth 97-109 [China Shipping] Container Terminal Project
Port of Los Angeles Berth 97-109 Container Terminal Project
Port of Los Angeles Berth 97-109 Container Terminal Project (China Shipping Line Phases I, II, and III)