SCH Number 2003022029


Project Info

Title
EG-01-240 East Franklin Specific Plan Amendment
Description
The project involves a General Plan Amendment and Specific Plan Amendment to modify land uses within the southern portion of the East Franklin Specific Plan. The amendment includes: - A realignment of the drainage parkway. The drainage/parkway between Poppy Ridge Road and Franklin Boulevard is currently constructed as of November 16, 2002. The modification of the drainage/parkway within this application reflects actual built conditions. -Realignment of several major roadways. The drainage/parkway modification requires the altering of 24 Street, 25 Street and 26 Street alignments. Overall circulation continuity is maintained. -Increase in the amount of multifamily housing from 30.3 net acres to 64.0 net acres. The City Council directed staff to increase the amount of multifamily sites in the EFSP. Three additional sites are now proposed. -Relocation of a continuation school from along Franklin Boulevard to along 24 Street. This is done with the direction from the Elk Grove Unified School District. -Creation of a Water Treatment Plant along Franklin Boulevard. This is done at the direction from the Elk Grove Unified School District. -Creation of a Water Treatment Plant along Franklin Boulevard. This is done at the direction of Zone 40 Water Supply. -Creation of a Fire Station parcel along 24 Street. This is done at the direction of Elk Grove Community Services District - Fire Department.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Elk Grove EG-01-240 East Franklin Specific Plan Amendment
City of Elk Grove EG-01-240 East Franklin Specific Plan Amendment