Removal Action Workplan: Former Macy Street Site
Description
The removal action measures involve the excavation, removal, and transportation of polycyclic aromatic hydrocarbon (PAH) and total recoverable petroleum hydrocarbon (TRPH) contaminated soils to a maximum depth of 10', and treatment of the contaminated soils at an offsite thermal treatment facility. The estimated volume of soil to be remediated is 8700 cubic yards. Following the removal of the contaminated soils, the Site will be backfilled, graded and compacted. The schedule to complete remediation and Site restoration activities is estimated at 2.5 to 3.0 months.