SCH Number 2002101092
Project Info
- Title
- Historical Park Bridge Crossing of San Benito River
- Description
- Construct a new bridge crossing into Historical Park, over Tres Pinos Creek, to replace an existing low water crossing, using funds provided by the Federal Highway Administration (FHWA). The permanent crossing would consist of a six-span, cast-in-place reinforced concrete slab design. Replacement of the seasonal bridge would provide year round access to the park and eliminate the semi-annual installation and removal of the temporary crossing.
3 documents in project