SCH Number 2002091101
Project Info
- Title
- Ventura Harbor Village Dock Replacement and Slip Reconfiguration
- Description
- The Ventura Port District proposes to repair and reconstruct portions of docks C, D, E, F, G, H and I in the Ventura Harbor Village boat basin tat are substantially deteriorated and worn. In addition, the Ventura Port District proposes to reconfigure docks D, E, F and I to provide a greater variety of slip sizes and create some larger slips to accommodate commercial fishing vessels. The reconfiguration will reduce the total number of slips from 162 to 144 boat slips. Project construction will be divided into two phases over 5 years.
2 documents in project