SCH Number 2002082090


Project Info

Title
Saratoga Fire Station
Description
The project is a continuation of an existing use within the Professional Administrative (P-A) zone. The Saratoga Fire District is requesting a Temporary Use Permit, Set-back Variance, Design Review, Alley Vacation, Conditional Use Permit and a Lot Line Adjustment. The project includes demolition of two existing buildings; the 7,690 square feet existing Fire Station, and the 4,000 s.f. "Contempo" office building south of the Fire Station at 20473 Saratoga-Los Gatos Road, installation of a temporary fire station, and construction of a new Saratoga Fire Department Headquarters Fire Station at 14380 Saratoga Avenue. The total site area of the two lots is 35,484 square feet. The total number of employees is 20; 8 firefighters and 4 administrative staff, and 8 shift-change firefighters. The project will be implemented in three phases.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
City of Saratoga Saratoga Fire Station
City of Saratoga Saratoga Fire Station
City of Saratoga Saratoga Fire Station