SCH Number 2001121044
Project Info
- Title
- 14th Street/Wilson Creek Crossing
- Description
- SAA #6-2002-087 Alter the streambed to install footings for a bridge over Wilson Creek. Construction consists of two (2) through lanes in each direction, one (1) center turn lane, and two (2) five foot sidewalks. One piling will be installed in the Creek and abutments will be installed outside the channel banks. Construction of the project involves permanent impact to 85 linear feet of stream and temporary imapct to 112 linear feet of stream.
4 documents in project