SCH Number 2001042011
Project Info
- Title
- Hiram Johnson West Campus Detention Basin CIP# WK01
- Description
- The project consists of the construction of a 4.6-acre detention basin with underground pipeline extensions, which is designed to alleviate flooding on the residential streets. The detention basin can be used jointly with the high school for ballfields in the dry season. No equipment will be above ground.
3 documents in project