SCH Number 2000112025
Project Info
- Title
- Franklin and Boyce Detention Basin Project
- Description
- The project consists of the construction of a new 8-acre storm water detention basin within the 12 acre site, including pipe extension to the existing pipe alignment located within Boyce Drive, and joint use of the basin and remaining portion of the site as multi-purpose recreation/soccer fields.
2 documents in project