SCH Number 2000111051
Project Info
- Title
- Painted Turtle Camp; Project 00-079 (Conditional Use Permit)
- Description
- The applicant proposes to alter the streambed by demolishing and existing RV/camping facility and replace it with a camp facility for children with chronic and life threatening illnesses. The project includes the construction and reconstruction of three debris basins and three desilting basins. Impacts also include the widening/replacement of an existing bridge, replacement of a boat dock for recreational use of the ponds and the construction of the boat house, construction of a portion of the sewer. The project also involves the widening of the ponds and slightly deepening the ponds for better water circulation. Impacts to riparian vegetation occur with road improvements to meet current fire department circulation requirements. Debris basins require minor cleanout. In addition, two concrete desilting inlets between basins 1 and 2 will be constructed. The project will impact 0.14 acres of wetlands, but will create/enhance 0.93 acres of wetlands a mitigation ratio of 0.93 acres. The project will also impact 0.75 acres of riparian and will create/enhance 19.88 acres of riparian.
3 documents in project