Vallecitos 9 Flow Control Facility in the City of San Marcos
Description
Construction and operation of approximately 500 square feet partially buried concrete vault and valve/meter facility; installation and operation of approximately 2,000 linear feet of 30 inches diameter steel underground pipeline connecting to existing Vallecitos Water District water distribution system; demolition and removal of existing valve/meter facility in nearby Bradley Park.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
San Diego County Water Authority Vallecitos 9 Flow Control Facility in the City of San Marcos
San Diego County Water Authority Vallecitos 9 Flow Control Facility in the City of San Marcos