SCH Number 2000091032
Project Info
- Title
- Vallecitos 9 Flow Control Facility in the City of San Marcos
- Description
- Construction and operation of approximately 500 square feet partially buried concrete vault and valve/meter facility; installation and operation of approximately 2,000 linear feet of 30 inches diameter steel underground pipeline connecting to existing Vallecitos Water District water distribution system; demolition and removal of existing valve/meter facility in nearby Bradley Park.
2 documents in project