SCH Number 2000032015
Project Info
- Title
- Storm Drainage Master Plan Supplement No. 1 (Westside Channel Outfall System)
- Description
- The proposed project involves construction of storm drainage conveyance infrastructure and open channels totaling approximately 2 linear miles, repairs and improvements to six capacity "bottlenecks" along the Westside Irrigation District Main Drain, and the future construction of or modifications to six water detention basins (five of which are upstream of Eleventh Street) totaling approximately 116 acres.
2 documents in project