SCH Number 1999058002
Project Info
- Title
- Time-Critical Removal Action Workplan, Highway 99/Merced River Bridge
- Description
- The Time-Critical Removal Action (TCRAW) will remove the lead contaminated soil to levels that are protective of future risk to human health, surface water, and groundwater. Between 1,000 to 1,500 cubic yards of lead contaminated soil will be excavated for offsite disposal at a Class 1 landfill. The lead contaminated soil primarily exists immediately adjacent to, or within the drip line of, the old bridge.
2 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOE | California Department of Toxic Substances Control (DTSC) | Time-Critical Removal Action Workplan, Highway 99/Merced River Bridge | |
NOE | California Department of Toxic Substances Control (DTSC) | Time-Critical Removal Action Workplan, Highway 99/Merced River Bridge |