Title
Time-Critical Removal Action Workplan, Highway 99/Merced River Bridge
Description
The Time-Critical Removal Action (TCRAW) will remove the lead contaminated soil to levels that are protective of future risk to human health, surface water, and groundwater. Between 1,000 to 1,500 cubic yards of lead contaminated soil will be excavated for offsite disposal at a Class 1 landfill. The lead contaminated soil primarily exists immediately adjacent to, or within the drip line of, the old bridge.