SCH Number 1998031135


Project Info

Title
Addendum to the Pier 400 Container Terminal and Transportation Corridor Project Supplemental Final Environmental Impact Report for the PMA Training Center
Description
This Addendum to the Final EIR for the PMA Training Center Project assesses the construction and operation of a training center to be located at the elbow of Pier 400. As the project site is currently vacant, the site would require alterations for operation as a training facility. Structures to be installed on the project site include a 20,000 sf pre-fabricated metal building, two prefabricated classrooms, and a pre-fabricated restroom. A personal vehicle parking lot will be designated as well. Landscaping may be installed on the perimeter of the 20,000 square foot metal building. Training operations would include the maintenance and repair of cargo handling equipment, including but not limited to 20 foot (‘) and 40’ chassis, semi-tractors/utility tractor rigs (UTRs), forklifts, heavy-lifts, top-picks, and side-picks. All repair and maintenance training would occur within buildings as classroom training or hands-on training. The construction and operation of a training center at Pier 400 consists of activities that would not create any new impacts nor a substantial increase to impacts previously disclosed in the Final EIR. A Los Angeles Harbor Department Entitlement valid for 10 years upon issuance would be granted to PMA for construction and operation of the Proposed PMA Project.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Port of Los Angeles Addendum to the Pier 400 Container Terminal and Transportation Corridor Project Supplemental Final Environmental Impact Report for the PMA Training Center
Los Angeles Harbor Department PIER 400 CONTAINER TERMINAL & TRANSPORTATION CORRIDOR