SCH Number 1997072011
Project Info
- Title
- Downtown Ferry Terminal
- Description
- The Conservancy is helping to fund the construction of a 600-foot public pier on top of the southern breakwater that was built by the Port of San Francisco in 2001 as part of the Downtown Ferry Terminal Project. A trestle will be built to connect the pier to the Embarcadero, railing and lights will be added with pavement.
2 documents in project