SCH Number 1995101043
Project Info
- Title
- OLINDA/OLINDA ALPHA LANDFILL DETENTION BASIN B
- Description
- PROJECT INVOLVES THE CONSTRUCTION OF A 6" REINFORCED CONCRETE LINED DETENTION BASIN AND THE REPLACEMENT OF TWO TEMPORARY EARTHEN DRAINAGE CHANNELS WITH TWO 3' X 5' TRAPEZOIDAL CONCRETE FINAL DRAINAGE CHANNELS.
2 documents in project