SCH Number 1993121007


Project Info

Title
Berryman Reservoir Replacement
Description
The proposed work includes the construction of a steel pipe spillway riser that will be connected to a 12 inch diameter drain line. The top of the spillway riser will be at Elevation 483 ft.
Download CSV New Search

 

4 documents in project

Type Lead/Public Agency Received Title
East Bay Municipal Utility District (EBMUD) Berryman Reservoir Dam
East Bay Municipal Utility District (EBMUD) Berryman Reservoir Replacement
East Bay Municipal Utility District (EBMUD) Berryman Reservoir Replacement
East Bay Municipal Utility District (EBMUD) Berryman Reservoir Replacement