SCH Number 1992042103
Project Info
- Title
- Water District Draft Water Plan
- Description
- Twentynine Palms Water District intends to replace about 57,120 lineal feet of water pipelines within the projet area. The new PVC water pipelines will range from 6 to 12 inches in size. Construction will consist of digging trenches approximately 4-5 feet in depth, installing the pipeline and filling the trenches in accordance with standard backfilling requirements. No change in water production is forecast to occur.
2 documents in project