SCH Number 1991122014


Project Info

Title
Silver Springs Parkway to Bass Lake Road (south segment)
Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2018-0032-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, The El Dorado County Dept. of Transportation. Project is limited to the construction of a segment of Silver Springs Parkway and associated infrastructure, and realignment of Bass Lake Road from south of the Bass Lake Road/Madera Way intersection north to a new intersection that will be constructed at Bass Lake Road/Silver Springs Parkway. The segment of Silver Springs Parkway will be approx. 1,400 feet long, and the reconstructed segments of Bass Lake Road will be approx. 800 and 500 feet long. Storm drain facilities, including a pipe network, concrete-lined ditches, unlined ditches, and drain inlets and outlets will be installed within the roadway right-of-way and drainage easements.
Download CSV New Search

 

9 documents in project

Type Lead/Public Agency Received Title
El Dorado County Silver Springs Offsite (South Segment) Lake or Streambed Alteration Agreement No. 1600-2018-0032-R2)
El Dorado County Subsequent Environmental Impact Report for the Silver Springs Parkway to Bass Lake Road (South Segment) Project (CIP #76108)
El Dorado County Silver Springs Parkway to Bass Lake Road (south segment)
El Dorado County Silver Springs Parkway to Base Lake Road (south segment)
El Dorado County Bass Lake Road Realignment
El Dorado County Bass Lake Road Realignment
El Dorado County Bass Lake Road Realignment
El Dorado County Bass Lake Road Realignment
El Dorado County Bass Lake Road Realignment