SCH Number 1991063072
Project Info
- Title
- Los Vaqueros Stage 2
- Description
- Contra Costa Water District (CCWD) currently operates and maintains the Los Vaqueros Project (LVP) which includes a dam and reservoir in the Kellogg watershed in eastern Contra Costa County and three existing intakes and pumping systems: Mallard Slough, Rock Slough, and Old River. CCWD is constructing a new intake, the Alternative Intake Project (AIP), at a site along the lower third of Victoria Canal (in the south-central part of the Delta). The AIP will include a state-of-the-art fish screen, pumping plant, and an associated pipeline across Victoria Island connecting the new intake to the existing Old River conveyance system on Byron Tract.
6 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Contra Costa Water District | Maintenance and Operation of the Los Vaqueros Project including the new Alternative Intake Project 2081-2099-013-03 | |
NOD | Contra Costa Water District | Los Vaqueros Reservoir Project | |
NOD | Contra Costa Water District | Los Vaqueros Reservoir Project | |
NOD | Contra Costa Water District | Los Vaqueros Bullfrog Barrier | |
EIR | Contra Costa Water District | Los Vaqueros Stage 2 | |
NEG | Contra Costa Water District | Los Vaqueros Stage 2 |