SCH Number 1990011104
Project Info
- Title
- PHASE II OF THE SWEETWATER RESERVOIR URBAN RUNOFF PROTECTION
- Description
- THE SOUTH SIDE URBAN RUNOFF DIVERSION SYSTEM WILL PREVENT URBAN RUNOFF FROM ENTERING THE SWEETWATER RESERVOIR, WHICH IS PART OF THE PUBLIC WATER SUPPLY SYSTEM. THE LOW FLOR INTERCEPTOR WILL DIVERT "FIRST FLUSH" FLOWS, WHICH ARE HIGH IN CONTAMINANTS, FROM THE SWEETWATER RIVER UPSTREAM OF THE RESERVOIR. FLOWS WILL BE DIVERTED TO THE DIVERSION POND AND LATER RELEASED DOWNSTREAM OF THE RESERVOIR.
2 documents in project