SCH Number 1989080403
Project Info
- Title
- INTERIM REMEDIATION SYSTEM, TREATMENT OF GROUNDWATER
- Description
- THREE-PART PROJECT CONSISTING OF: 1) 17 WATER EXTRACTION WELLS FOR DRAWING CONTAMINATED WATER FROM THE UPPER GROUNDWATER AQUIFER; 2) AN AIR STR TCE CONTAMINATES FROM THE WATER; 3) A POND AND SIX REINJECTION WELLS FOR HANDLING THE DISCHARGE FROM THE AIR STRIPPER.
2 documents in project