SCH Number 1989040702
Project Info
- Title
- VENTURA HARBOR FEASIBILITY STUDY
- Description
- PLAN TO EXTEND THE DETACHED BREAKWATER TO THE SOUTH BY 300 FEET, CONSTRUCT A 250 FT SPUR GROIN ATTACHED TO THE NORTH JETTY AND A 650 FT BEACH GROIN LOCATED 1,000 FT DOWNCOAST FROM THE SOUTH JETTY.
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
FON | United States Army, Army Corps of Engineers (USACE) | VENTURA HARBOR FEASIBILITY STUDY | |
FIN | United States Army, Army Corps of Engineers (USACE) | VENTURA HARBOR FEASIBILITY STUDY | |
EA | United States Army, Army Corps of Engineers (USACE) | VENTURA HARBOR FEASIBILITY STUDY |