SCH Number 1989010177
Project Info
- Title
- MOBIL OIL M-70 REPLACEMENT AND SYSTEM OPTIMIZATION
- Description
- MOBIL OIL CORPORATION PROPOSES TO CONSTRUCT A SIXTEEN-INCH DIAMETER PIPELINE IN CITY STREETS AND LOCATIONS OUTSIDE THE CITY TO TRANSPORT CRUDE OIL FROM AN EXISTING PUMP STATION AT LEBEC TO MOBIL'S TORRNCE REFINERY. THE PROPOSED PIPELINE WILL REPLACE AN EXISTING LINE WHICH WILL BE ABANDONED. A RETAINLED DESCRIPTION OF THE PROJECT (WITH MAPS) IS INCLUDED IN THE DEIR/S.
3 documents in project