SCH Number 1987102808
Project Info
- Title
- PICO-KENTER STORM DRAIN IMPROVEMENT PROGRAM
- Description
- PICO-KENTER STORM DRAIN IMPROVEMENT PROGRAM WHICH CONSISTS OF THE EXTENSION OF THE DRAIN FROM THE SHORE TO A POINT 600 BEYOND THE SUFF LINE; THE INSTALLA SYSTEM TO DETECT THE PRESENCE AND CONCENTRATION OF HYDRO- CARBON VAPORS; INCREASED POLLUTION CONTROL ENFORCEMENT AND MONITORING OF THE RUNOFF; AND IMPR
2 documents in project