SCH Number 1983120706
Project Info
- Title
- CAMPUS BY THE SEA DOCK
- Description
- CONSTRUCTION OF 8' X 200' WOOD PILE PIER AND 24' X 48' FLOAT AT END OF PIER. SITE OF PROPOSED PIER IS PRESENTLY USED FOR APLICANT'S LANDING SYSTEM, CONSISTING OF A FLOAT AND SHUTTLE-BOAT PULLY OPERATION.
2 documents in project