6325 Stockton Boulevard Mixed-Use Project

Summary

SCH Number
2025050127
Lead Agency
City of Sacramento
Document Title
6325 Stockton Boulevard Mixed-Use Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
The 2.99-acre site located at 6325 Stockton Boulevard in the City of Sacramento is currently developed with an automotive repair shop, a car wash and oil change facility, and an unoccupied single-family residence. In addition, a total of 19 trees are scattered throughout the site. The project site is located in the Fruitridge/Broadway Community Plan. According to the City’s 2040 General Plan, the site is designated Residential Mixed Use (RMU) and the site is zoned as C-2-SPD, C-2, and C-1.
Document Description
The 6325 Stockton Boulevard Mixed-Use Project (proposed project) would include the removal of all on-site structures and trees, and the development of two, three-story residential buildings with 24 units in each for a total of 48 apartment units, a car wash station, an oil change facility, and a playground/greenspace area for resident use. The proposed project would include 86 parking spaces throughout the project site. Site access would be provided by three new driveways, two connections to Dias Avenue north of the site and one to Stockton Boulevard in the southwest corner of the site.

Contact Information

Name
Ron Bess
Agency Name
City of Sacramento, Community Development Department
Job Title
Associate Planner
Contact Types
Lead/Public Agency

Name
Brian Holloway
Agency Name
Holloway Land Company
Job Title
President
Contact Types
Project Applicant

Name
Rod Stinson
Agency Name
Raney Planning & Management, Inc.
Job Title
Vice President
Contact Types
Consulting Firm

Location

Cities
Sacramento
Counties
Sacramento
Regions
Citywide
Cross Streets
Dias Avenue and Stockton Boulevard
Zip
95824
Total Acres
2.99
Parcel #
038-019-001, -003, and -025
State Highways
99
Railways
UPRR
Airports
N/A
Schools
Northern California Preparatory School, etc.
Waterways
Morrison Creek
Township
8N
Range
5E
Section
28
Base
MDBM
Other Location Info
Other schools in the project vicinity include: Will C. Wood Middle School, Camellia, Elementary School, Clayton B Wire Elementary School, Sacramento Accelerated Academy, Nicholas Elementary School

Notice of Completion

Development Types
Residential (Units 48, Acres 1.66), Commercial (Sq. Ft. 5895, Acres 1.33, Employees 1)
Local Actions
Site Plan, Rezone, Use Permit, Design Review, Lot Merger
Project Issues
Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Tribal Cultural Resources
Public Review Period Start
Public Review Period End

Attachments

Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print