FY24-25 Road Overlay, Project No. RR31002571S

Summary

SCH Number
2025041120
Public Agency
Sutter County
Document Title
FY24-25 Road Overlay, Project No. RR31002571S
Document Type
NOE - Notice of Exemption
Received
Posted
4/23/2025
Document Description
Six (6) road segments for a total of 4.77 mites require rehabilitation due to the deterioration of their roadway surface. The road segments will receive a 1.5" rubberized asphalt single pass overlay. All work will occur within the County's existing right-of-way and will not widen the existing asphalt roadway. Currently the roadway width varies from 12 to 40 feet. The work will occur on 1st Avenue, 2nd Avenue, 3rd Avenue, Marshall Street, Dresser Road, and Sheppard Road. The Barry Road speed table is included as a possible alternative.

Contact Information

Name
Scott S. Riddle
Agency Name
Sutter County Development Services Department
Job Title
Senior Civil Engineer
Contact Types
Lead/Public Agency

Location

Cities
Unincorporated Area
Counties
Sutter
Regions
Unincorporated
Total Acres
4.77
State Highways
Hwy 20 and Hwy 99
Railways
Union Pacific
Schools
Multiple
Waterways
Wadsworth Canal
Base
MDB&M
Other Location Info
1. 1st Avenue from the South End to South Butte Road 2. 2nd Avenue from the South End to South Butte Road 3. 3rd Avenue from the South End to South Butte Road 4. Marshall Street from Acacia Avenue to Rebecca Lane 5. Dresser Road from Township Road to Fortna Road 6. Sheppard Road from Canal Bridge to Broadway 7. Additive Alternative - Barry Road Speed Table

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15301 [Existing Facilities]
Reasons for Exemption
15301 [Existing Facilities], Class 1 consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of an existing use. This project will repair six (6) existing segments of road in unincorporated Sutter County. All work will occur within the County's existing right-of-way and will not widen the existing asphalt of the roadway. This project results in no expansion of the existing use.
County Clerk
Sutter

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print