Marina Pumping Plant No. 2 Site Improvements (Case No. 2309-07)

Summary

SCH Number
2025040741
Public Agency
City of Long Beach
Document Title
Marina Pumping Plant No. 2 Site Improvements (Case No. 2309-07)
Document Type
NOE - Notice of Exemption
Received
Posted
4/15/2025
Document Description
A Local Coastal Development Permit request to provide safety and preventative maintenance improvements to an existing sanitation facility that includes the demolition of concrete and electric switchboard and construction of a replacement accessory structure for upgraded electrical equipment and restroom, totaling 276 square feet, at a site located at 6268 East Pacific Coast Highway in the Mixed-Use Community Core (MU-CC) designation of the Southeast Area Specific Plan (SEASP) (SP-2). Additionally, site improvements include replacing aging pumps, discharge pipes, valves, supports in the drywell, installing electromagnetic flowmeters, demolishing and reconstructing valve structures with redundancy, rehabilitating the wet well, installing security measures (e.g., cameras, motion detector lights, perimeter fencing), and completing other miscellaneous site improvements to improve redundancies and reduce risk of sewage flow into adjacent wetlands in case of equipment failure. The project includes a Standards Variance request to allow an approximately 30-foot buffer for the new site improvements, instead of a 100-foot buffer area, to open water areas pursuant to Policy 5.2 of the SEASP as the project site and existing sanitation facility is completely located within the buffer area.

Contact Information

Name
Maryanne Cronin
Agency Name
City of Long Beach Community Development Department, Planning Bureau
Job Title
Zoning Administration Officer
Contact Types
Lead/Public Agency

Location

Cities
Long Beach
Counties
Los Angeles
Regions
Citywide
Cross Streets
Pacific Coast Highway
Zip
90803
Parcel #
7242-021-900
State Highways
SR-1, SR-22
Airports
Long Beach Airport
Waterways
Los Cerritos Channel, Alamitos Bay
Other Location Info
6268 East Pacific Coast Highway

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301
Reasons for Exemption
The site is developed as a sanitation district property with existing infrastructure. Based on the biological survey prepared for the project, no impacts to sensitive species or disruption to local sensitive coastal habitats are anticipated to occur as a result of Project activities (Results of the Biological Survey for Marina Pumping Plant No. 2, 2023). The project include repairs and modifications to an existing public infrastructure facility with no expansion of use. The project includes replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced including existing utility systems involving negligible expansion of capacity. The project includes construction of limited numbers of new small facilities. Further, the project includes construction of equipment to increase redundancy to avoid the risk of pump and equipment failures, which constitutes a project necessary to prevent or mitigate an emergency in the event of failure.

Exempt Status
Categorical Exemption
Type, Section or Code
15302
Reasons for Exemption
The site is developed as a sanitation district property with existing infrastructure. Based on the biological survey prepared for the project, no impacts to sensitive species or disruption to local sensitive coastal habitats are anticipated to occur as a result of Project activities (Results of the Biological Survey for Marina Pumping Plant No. 2, 2023). The project include repairs and modifications to an existing public infrastructure facility with no expansion of use. The project includes replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced including existing utility systems involving negligible expansion of capacity. The project includes construction of limited numbers of new small facilities. Further, the project includes construction of equipment to increase redundancy to avoid the risk of pump and equipment failures, which constitutes a project necessary to prevent or mitigate an emergency in the event of failure.

Exempt Status
Categorical Exemption
Type, Section or Code
15303
Reasons for Exemption
The site is developed as a sanitation district property with existing infrastructure. Based on the biological survey prepared for the project, no impacts to sensitive species or disruption to local sensitive coastal habitats are anticipated to occur as a result of Project activities (Results of the Biological Survey for Marina Pumping Plant No. 2, 2023). The project include repairs and modifications to an existing public infrastructure facility with no expansion of use. The project includes replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced including existing utility systems involving negligible expansion of capacity. The project includes construction of limited numbers of new small facilities. Further, the project includes construction of equipment to increase redundancy to avoid the risk of pump and equipment failures, which constitutes a project necessary to prevent or mitigate an emergency in the event of failure.

Exempt Status
Emergency Project
Type, Section or Code
Sec. 21080(b)(4); 15269(b)(c)
Reasons for Exemption
The site is developed as a sanitation district property with existing infrastructure. Based on the biological survey prepared for the project, no impacts to sensitive species or disruption to local sensitive coastal habitats are anticipated to occur as a result of Project activities (Results of the Biological Survey for Marina Pumping Plant No. 2, 2023). The project include repairs and modifications to an existing public infrastructure facility with no expansion of use. The project includes replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced including existing utility systems involving negligible expansion of capacity. The project includes construction of limited numbers of new small facilities. Further, the project includes construction of equipment to increase redundancy to avoid the risk of pump and equipment failures, which constitutes a project necessary to prevent or mitigate an emergency in the event of failure.
County Clerk
Los Angeles

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print