Annual Sewer Lateral Repair Project 2024 (Round Three)

Summary

SCH Number
2025040585
Public Agency
City of Eureka
Document Title
Annual Sewer Lateral Repair Project 2024 (Round Three)
Document Type
NOE - Notice of Exemption
Received
Posted
4/10/2025
Document Description
The project includes the excavation and replacement of multiple defective sewer lateral lines in batches by disconnecting the old section of pipe, installing the new sewer pipe, and reconnecting the lateral pipes from the dwelling to the sewer main. After completing the lateral connections, the disturbed site will be backfilled and compacted. The replacement or repair of sidewalks, driveways, and streets damaged or removed by the sewer lateral installation will be performed to City Standards and Specifications for Construction of Sidewalk, Curbs, Gutters, and Drop Curb Entrances (City of Eureka Resolution No. 6219, EMC §13.04.110, Standards for Sidewalks and Curbs). During construction, the contractor will be required to employ standard Best Management Practices (BMPs) to minimize environmental impacts, and to ensure minimal disruption to traffic, nearby residences and businesses. Erosion control will be implemented per an Erosion Control Plan developed by the contractor and approved by the City. The contractor will be required to clean the construction site at the end of each day. If the contractor obtains additional staging areas that result in total project disturbance of more than one acre, the contractor will be required to prepare and comply with a Storm Water Pollution Prevention Plan (SWPPP) in accordance with Construction General Permit Order 2009-0009-DWQ, and will obtain any required land use entitlements (such as a Use Permit or Coastal Development Permit) required for the staging areas. Traffic control will be implemented per a traffic control plan approved by the City. General circulation and access will be maintained in the areas of construction. There will be temporary lane shifts, short-term road closures with available detours, and controlled traffic. Emergency vehicles will be allowed through the construction areas. The City will provide pre-construction notices to potentially impacted businesses, and residents, and provide public service announcements that inform the public of the planned construction activities. Construction is planned to start May 15, 2025 and will terminate December, 2025. Construction hours will be 8 a.m. to 5 p.m., Monday-Friday.

Contact Information

Name
Brittany Powell
Agency Name
City of Eureka - Engineering
Job Title
Project Manager
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Eureka
Counties
Humboldt
Regions
Northern California
Cross Streets
Various location Citywide
Zip
95501
Parcel #
Multiple Citywide Sites - see list in other location info below
State Highways
Highway 101 and 255
Schools
Eureka Union School District
Waterways
Humboldt Bay
Other Location Info
• 3485 Elizabeth Street (009-201-011) • 838 McCullens Avenue (008-213-007) • 3516 High Street (008-143-003) • 615 Russ Street (011-051-006) • 3634 G Street (011-111-005) • 4999 Lundblade Drive (301-271-027) • 2535 Summer Street (009-142-011) • 1840 Buhne Street (013-251-025) • 1516 Hayes Street (012-182-007) • 1213 Bryant Street (012-081-003) • 2424 M Street (013-036-005) • 3321 L Street (011-203-010) • 1126 Hodgson Street (011-203-012) • 2908 Q Street (012-194-010) • 1109 Buhne Street (012-031-004) • 1222 L Street (005-101-003)

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 1 Section 15301 - Existing facilities
Reasons for Exemption
The proposed project qualifies for this exemption because it involves replacement and maintenance of sewer laterals with no expansion of use.
County Clerk
Humboldt

Attachments

Notice of Exemption

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.