COMMERCIAL CENTER SAFE ROUTES TO SCHOOL AND GREEN STORMWATER INFRASTRUCTURE PROJECT

Summary

SCH Number
2025040478
Lead Agency
City of Shasta Lake
Document Title
COMMERCIAL CENTER SAFE ROUTES TO SCHOOL AND GREEN STORMWATER INFRASTRUCTURE PROJECT
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Commercial/Urban Residential - Commercial Planned Development/Urban Residential
Document Description
The project will generate a seamless network of complete streets creating safe routes to Grand Oaks School and connections to improved open space areas, trails, residential neighborhoods, shopping, employment centers, government facilities, Tribal owned land, recreation areas, and other local destinations. These projects will serve the needs of all transportation users including pedestrians, bicyclists, people with disabilities, transit riders, and motorists. The WRHCO has begun master planning the commercial center property, and coordination with WRHCO and their design team is anticipated. The roadway portion of the project will have complete streets components to promote multi-modal transportation. Coordination with the urban designer, landscape architect, Redding Rancheria (and their design team) and the City is required to provide a seamless concept of complete streets and to complement the commercial center’s development vision. The project also includes an approximately 2-acre open space on the northeast portion of the project site, adjacent to Moody Creek. This area has been set aside to provide amenities such as walking trails, native landscaping including shade trees, green sustainable stormwater infrastructure including bio-retention, bio-swales, pedestrian lighting, seating, picnic benches, shade structure, drinking fountains, waste receptacles, and bike racks. The goals of the project are to: • Enhance safety and ease of travel for school children who walk, bicycle, carpool, and/or utilize transit to travel to school or school-related activities. • Provide safe facilities for all transportation users – pedestrians, bicyclists, people with disabilities, transit users, and motorists. • Decrease traffic congestion around Grand Oaks School, reduce school-related travel emissions, and improve the health, well-being, and safety of students and residents. • Enhance walking and bicycling safety, comfort, and convenience. • Create a natural recreation space to increase opportunities for physical activity and utilize the natural infrastructure of the site in conjunction with green sustainable stormwater infrastructure to maximize stormwater capture and minimize pollution. In general, the identified Project improvements include: • Construction of curb, gutter, sidewalk, utilities, drainage infrastructure and lighting improvements to: - 700± linear feet; Grand Avenue from Shasta Way to Wonderland Boulevard - 850± linear feet; Shasta Way from Grand Avenue to Shasta Dam Boulevard - 600± linear feet; Cascade Boulevard from Shasta Dam Boulevard to Wonderland Boulevard - 200± linear feet; Shasta Dam Blvd (SR-151) from Shasta way east towards Cascade Boulevard • Construction of 600± linear feet of new Wonderland Boulevard from Cascade Boulevard to Grand Avenue including: - Street section consistent with an 84-ft right of way per City of Shasta Lake Construction Standards (COSLCS) including landscaped medians. - Complete street design components - Utility design & coordination (water, wastewater, stormwater, joint utility trench & irrigation) - Safe crossing infrastructure from Commercial Center site to open space (across Wonderland Blvd.) • A 2-acre open space adjacent to Moody Creek with the following improvements: - 1600± linear feet of improved trails - Pedestrian lighting, seating, picnic benches, a shade structure, drinking fountains, trash receptacles, signage, and a bike rack - Enhanced water-wise landscaping and shade tree planting consistent with existing and native flora. - Green sustainable stormwater infrastructure including bioretention and bioswales

Contact Information

Name
Peter Bird
Agency Name
City of Shasta Lake
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Location

Cities
Shasta Lake
Counties
Shasta
Regions
Citywide
Cross Streets
CASCADE BLVD, SHASTA DAM BLVD. (SR 151), SHASTA WAY
Zip
96019
Total Acres
15.75
Parcel #
007-380-051/054/053/037/052/005/006/007/008
State Highways
151
Railways
Union Pacific
Airports
None
Schools
Gateway Unified
Waterways
Moody Creek, Salt Creek
Township
33N
Range
4W
Section
29 32
Base
MDM

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Education, California Department of Fish and Wildlife, Northern and Eureka Region 1 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Housing and Community Development (HCD), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 2 (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Fish and Game Commission (CDFGC), California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Redding Region 5 (RWQCB), California State Lands Commission (SLC), Central Valley Flood Protection Board, Delta Stewardship Council, Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, University of California Natural Reserve System (UCNRS)
Development Types
Transportation:Highway/Freeway (SR 151 Active Transportation Improvements), Transportation:Local Road (Active Transportation Improvements)
Local Actions
Redevelopment, None
Project Issues
Air Quality, Biological Resources, Noise
Public Review Period Start
Public Review Period End

Attachments

Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print