Franklin Elementary School Campus Plan Project

2 Documents in Project

Summary

SCH Number
2025030429
Lead Agency
Santa Monica-Malibu Unified School District
Document Title
Franklin Elementary School Campus Plan Project
Document Type
NOD - Notice of Determination
Received
Posted
5/16/2025
Document Description
The Proposed Project would renovate and modernize the existing Franklin Elementary School campus to develop new and updated facilities that would support project-based learning and provide learning opportunities that are flexible, adaptable, and with access to technology and resources in real time. At full buildout, the Proposed Project would increase the campus building area by approximately 29,286 (gross) square feet (from 63,002 square feet to 92,288 square feet). Redevelopment and modernization of Franklin Elementary School would consist of removing and demolishing seven permanent buildings, two modulars, and seven portable buildings; construct seven new buildings; and renovate one building and outdoor areas on the existing school campus and satellite facility. All entries to the school would be gated and/or secured. The District intends to proceed with design and engineering of the first phase of funded activities, and the later three phases would occur at the District’s discretion when funding becomes available. Maximum height of the renovated existing and new buildings would not exceed 32 feet. Implementation of the Proposed Project would not increase the capacity of the school and would not change the attendance boundaries.

Contact Information

Name
Carey Upton
Agency Name
Santa Monica-Malibu USD
Job Title
Chief Operations Officer
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Santa Monica
Counties
Los Angeles
Regions
Citywide
Cross Streets
2400 Montana Avenue between 23rd Street and 25th Street
Zip
90403
Total Acres
5.6 (Approx.)
Parcel #
4277-002-901
State Highways
I-10, Pacific Coast Highway
Railways
Metro Expo Line
Airports
N/A
Schools
18 schools
Waterways
Pacific Ocean
Township
01S
Range
15W
Section
31
Base
SBB&M
Other Location Info
Schools within 2 miles of Project Site: McKinley Elementary School, 2401 Santa Monica Boulevard, Santa Monica, CA 90404; Garden of Angels School (Preschool), 1009 18th Street, Santa Monica, CA 90403; Lincoln Middle School, 1501 California Avenue, Santa Monica, CA 90403; Roosevelt Elementary School, 801 Montana Avenue, Santa Monica, CA 90403; Lighthouse Church School, 1220 20th Street, Santa Monica, CA 90404; Cassidy Preschool, 2122 Wilshire Boulevard, Santa Monica, CA 90403; Evergreen Community School, 2800 Colorado Avenue, Santa Monica, CA 90404; Futures Academy – Brentwood, 12300 Wilshire Boulevard, Suite 110, Los Angeles, CA 90025; Brentwood Science Magnet Elementary School, 740 S. Gretna Green Way, Los Angeles, CA 90049; Sycamore Community School (Elementary School) - 1229 4th Street, Santa Monica, CA 90401; Calthorp School (Elementary School) – 438 San Vicente Boulevard, Santa Monica, CA 90402; Wildwood School (High School) – 11811 W. Olympic Boulevard, Los Angeles, CA 90064; Crossroads Elementary School, 1715 Olympic Boulevard, Santa Monica, CA 90404; Brockton Avenue Elementary School – 1309 Armacost Avenue, Los Angeles, CA 90025; Stratford School (Preschool) – 200 Stoner Avenue, Los Angeles, CA 90025; New Roads School - 3131 Olympic Boulevard, Santa Monica, CA 90404; Edison Language Academy – 2402 Virginia Avenue, Santa Monica, CA 90404; Grant Elementary School – 2368 Pearl Street, Santa Monica, CA 90405

Notice of Determination

Approving Agency
Santa Monica-Malibu Unified School District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
https://www.smmusd.org/Page/7689

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print