Aliso Creek Lift Station Improvements Project
3 Documents in Project
Summary
SCH Number
2025030205
Lead Agency
El Toro Water District
Document Title
Aliso Creek Lift Station Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
5/20/2025
Document Description
The project includes demolition, abandonment, removal, relocation, reconfiguration, and conversion of various components of the existing lift station; construction of a new wet well, new electrical building, two new emergency discharge manholes, a new force main connection, and a new access driveway on Avenida Sevilla; replacement of the existing emergency generator and portions of the existing block wall; and removal of approximately 15 trees. The proposed project would not expand the footprint of the Aliso Creek Lift Station beyond its current boundaries. The purposes of the project are to increase pump performance to allow the lift station to operate at a 4,100-gallon-per-minute design capacity, address the maintenance issues of the existing piping and equipment, simplify maintenance activities, and accommodate existing flows as well as the additional wastewater flows anticipated to be generated by the planned Village at Laguna Hills development.
Contact Information
Name
Hannah T. Ford, P.E.
Agency Name
El Toro Water District
Job Title
Director of Engineering
Contact Types
Lead/Public Agency
Phone
Email
Location
Coordinates
Cities
Laguna Woods
Counties
Orange
Regions
Southern California
Cross Streets
Avenida Sevilla and Avenida Majorca
Zip
92637
Total Acres
0.16
Parcel #
621-101-18, 621-101-04
State Highways
I-5, SR 73
Railways
Amtrak, Metrolink
Airports
N/A
Schools
multiple - see Other Information
Waterways
Aliso Creek
Township
7S
Range
8
Section
3
Base
SBPM
Other Location Info
Base - San Bernardino Principal Meridian Halstrom High School, Laguna Hills High School, Lomarena Elementary School, Los Alisos Intermediate School, Pathway School, Ralph A Gates Elementary School, The Geneva School OC, Valencia Elementary School
Notice of Determination
Approving Agency
El Toro Water District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Orange
Final Environmental Document Available at
https://etwd.com/aliso-creek-lift-station-project/
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.