PSR#TD004 Baker Boulevard Over Mojave River Bridge Replacement Project
2 Documents in Project
Summary
SCH Number
2025030204
Lead Agency
San Bernardino County
Document Title
PSR#TD004 Baker Boulevard Over Mojave River Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
5/2/2025
Document Description
The County, in coordination with Caltrans, proposes to replace the existing two-lane 22 span simple-supported stringer timber bridge that carries Baker Boulevard across the Mojave River Channel with a four-lane, 10-span cast-in-place reinforced concrete slab structure founded on cast-in-drilled hole piles (CIDH) or driven concrete pile extensions. The new bridge will include sidewalks, streetlights, and bridge barrier railing meeting current MASH safety and testing requirements. (PSR#TD004)
Contact Information
Name
Patrick Egle
Agency Name
San Bernardino County Department of Public Works
Job Title
Senior Planner
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Bernardino
Regions
Unincorporated
Other Information
The San Bernardino County, Department of Public Works (County) in cooperation with the California Department of Transportation (Caltrans), proposes to replace the existing two-lane timber bridge on Baker Boulevard, with a new four lane structure located near the unincorporated community of Baker in San Bernardino County, California
Notice of Determination
Approving Agency
San Bernardino County Department of Public Works
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
https://dpw.sbcounty.gov/#notices
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.