Claremont Mainline Replacement Project - NOE

Summary

SCH Number
2025021091
Public Agency
Carmichael Water District
Document Title
Claremont Mainline Replacement Project - NOE
Document Type
NOE - Notice of Exemption
Received
Posted
2/27/2025
Document Description
The project will replace old water mains operated by Carmichael Water District which have reached the end of their lifespan. Existing steel or asbestos concrete pipes will be replaced with polyethylene wrapped ductile iron pipe, buried to conform with the minimum standard of 3-feet of cover, and sized to current standards.

Contact Information

Name
Stephen Repace
Agency Name
Carmichael Water District
Job Title
Assistant Engineer
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Cities
Sacramento
Counties
Sacramento
Regions
Citywide
Cross Streets
Claremont Road and Fair Oaks Boulevard, and El Camino Avenue and Fair Oaks Boulevard
Zip
95608
Total Acres
1.84
Jobs
1

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 2 Exemption: 14 CCR 15302-Replacement or Reconstruction
Reasons for Exemption
The project will involve replacing existing water mains that have reached the end of their lifespan. The project will replace ~3880 linear feet of existing pipeline within public streets, which totals less than a mile in length.
County Clerk
Sacramento

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV New Search Print