California State University Monterey Bay Stadium Expanded Use Project

Summary

SCH Number
2025021013
Lead Agency
California State University Board of Trustees
Document Title
California State University Monterey Bay Stadium Expanded Use Project
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
CSUMB 2022 Master Plan: Athletics and Recreation
Document Description
California State University, Monterey Bay CSUMB Stadium Expanded Use Project proposes an expansion of existing programming at the CSUMB Stadium by CSUMB and the Monterey Bay Football Club (MBFC) and the construction and operation of two new locker room facilities, two new restroom buildings, and a gated event staging area just north of the stadium. The underlying purpose of the proposed project is the expansion of current stadium programming and facilities to accommodate college athletic championship events, additional CSUMB activities, and additional professional teams and games. The proposed facility improvements are necessary to ensure alignment with the requirements of the United Soccer League (USL) and the National Collegiate Athletic Association (NCAA). The project would support the educational mission of CSUMB by strengthening its role as a hub for athletics, academic growth, and community engagement. The expanded programming of CSUMB Stadium would allow CSUMB to host the men’s and women’s California Collegiate Athletic Association (CCAA) Championship tournaments and the NCAA Division II National Championships. CSUMB would also host the following non-athletic events: Latinx Affinity Ceremonies for graduating students; Monte’s 5k and post-race event; new student fall convocation; Otter Cross Cultural Center (OC3) affinity celebration; fall welcome concert; a spring concert; the Relay for Life; and up to 25 other university-related events. Additionally, the project would allow the CSUMB Stadium to host three new teams under the oversight of the MBFC (the existing professional team in a Facilities Shared-Use Agreement with CSUMB): one USL League Two (Men’s Amateur), one USL Super League (Women’s Pro), and one USL W League (Women’s Amateur). The project would accommodate games associated with these teams, totaling 18 events over 18 days for the USL Super League and 12 events over 10 days each for the USL League Two and USL W League. The CSUMB Stadium would also host other MBFC events, including a 28-day Winter Festival and up to 20 concerts annually, with a maximum attendance of 3,000 and 6,500 attendees, respectively. Proposed new facilities include the following: 1. Men’s & Women’s Locker Room and Shower Facility. Two permanent 1,400-sf locker room facilities would be constructed. One facility would replace the existing portable showers utilized by the men’s teams and would be built at the stadium entrance northwest of the field house. Another facility would be constructed to accommodate the women’s teams southwest of the field house. 2. Permanent Restroom Facilities. Two permanent restroom buildings, each approximately 1,000 sf, would be constructed within the existing beer garden area to replace the 3,000-sf area containing approximately 36 portable facilities currently used. 3. Storage and Staging Area. A new 1.25-acre dedicated storage and staging area would be established north of the stadium to support event operations, equipment storage, and logistical needs. No permanent construction of any structures besides fencing is planned for this site. Shipping containers, or other temporary units that do not require construction, may be moved into the staging area to protect equipment from the weather. Construction of these facilities is anticipated to take approximately nine months beginning in spring 2026.

Contact Information

Name
Matthew S. McCluney
Agency Name
California State University, Monterey Bay
Job Title
Director of Campus Planning & Development
Contact Types
Lead/Public Agency / Project Applicant

Name
Erin Harwayne, AICP
Agency Name
Denise Duffy and Associates
Job Title
Senior Planner/Project Manager
Contact Types
Consulting Firm

Location

Cities
Seaside
Counties
Monterey
Regions
Northern California
Cross Streets
Second Avenue and Divarty Street
Zip
93955
Total Acres
6
Parcel #
031-101-044-000
State Highways
California
Railways
N/A
Airports
N/A
Schools
CSU Monterey Bay
Waterways
Pacific Ocean
Other Location Info
The project site is located on the California State University, Monterey campus.

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Coastal Commission (CCC), California Department of Conservation (DOC), California Department of Education, California Department of Fish and Wildlife, Marin Region 7 (CDFW), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Forestry and Fire Protection (CAL FIRE), California Department of Parks and Recreation, California Department of Toxic Substances Control (DTSC), California Department of Transportation, District 5 (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Coast Region 3 (RWQCB), California State Lands Commission (SLC), Department of General Services (DGS), Office of Historic Preservation, State Water Resources Control Board, Division of Water Quality
Development Types
Recreational (Stadium)
Local Actions
Site Plan
Project Issues
Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation

Attachments

Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.

Download CSV Download All Attachments New Search Print